Ontario Agriculture

The network for agriculture in Ontario, Canada

My corn is planted and on its way up!  It was none too warm on the weekend while I sat on my open air tractor planting two fields of corn.  The cold rain on Monday gave me a bit to worry about, daytime highs of 13C are not particularly desirable, but the heat has shown up and the corn seed has noticed.  Only5 days in the ground and I have an up shoot. The forecast has some reasonable temperatures called for, so I hope to see it out of the ground by the end of next week.

I have been told, if it doesn't rain after you plant, that seed will look shallower every time you check, get a rain and you won't believe how deep it is.  After planting, I got a good 6 tenths.  I looks a good inch deeper than the day I put it in the ground.  I just about quit digging down when I found that little seed with a good inch of root and a small nub of an up shoot.  The ground is cracking nicely so I don't expect any issue with a crust stopping emersion, but there is a lot more rain in the forecast before that happens.

Planting didn't go particularly smooth.  I am pretty sure I didn't miss planting any rows, although I had to replant one when one of four row ran out of seed early.   Had a chain jump off the drive for the fertilizer, resulting in a second repeat run, but other than that I did my part well.  The fertilizer however, was in a hurry to get in the ground.  It was running a good 60% faster than the chart.  I believe I have one round with close to 400 lbs on it.  But I was thinking clear enough to mark my adjustments with a flag, so i should be able to get some good trial data from the extra 2 tonnes I had to buy.  

I am going to try a bit of non-roundup ready corn, to see how it yields and how weed control compares to the roundup ready variety.  The seed supplier was very concerned about selling me non-RR corn, concerned I would spray it the same way.  Never been a problem using different herbicides between corn and Soybeans, don't see why this was such a concern, other than someone has clearly forgot about the different varieties in the past.  My two fields are separated by a road, so I am not too concerned...until I completely loose my mind.

Next step is the herbicide, I haven't finalized what to use, but likely will take advantage of the next calm dry day to make something happen.  I have a week after all why rush the decision.  Not in any rush to plant the soybeans yet, but I am sure I will get the itch soon enough.

Views: 161

Tags: agriculture, corn, ontag

Comment

You need to be a member of Ontario Agriculture to add comments!

Join Ontario Agriculture

Comment by Roadrunner on May 17, 2012 at 8:22am

Good work Gus.

I hope your crops do well.

RR

Agriculture Headlines from Farms.com Canada East News - click on title for full story

Corn Futures Prices Rise On Demand & Outlook.

Monday's Closing Grain and Livestock Futures Prices And News

CropLine Podcast - June 14, 2013

Field crop specialists respond to current questions that grain and oilseed producers ask on crop management tips, herbicide recommendations and pest alerts.

Pulmotil® AC for respiratory disease control in swine now available in Canada

Aqueous concentrate formula makes control fast and effective

Ontario government needs to pick up the pace to sustain the horse racing industry

The provincial government is going in circles when it comes to the Ontario horse racing industry. Since the announcement cancelling the Slots at Racetrack program in March 2012, we’ve seen numerous reports from the Horse Racing Industry Transition Panel, a group of former Ontario cabinet ministers tasked with working with the horse racing industry and consulting on the sector’s transition. And now we can expect another report this month. But our industry needs less talk and more action.

AALP Class application extended to June 30

Prospective participants still have time to apply to Class 15 of the Advanced Agricultural Leadership Program (AALP). Those interested must submit an application to the Rural Ontario Institute office by June 30 to be considered for this 19-month executive leadership program.

© 2013   Created by Darren Marsland.

Badges  |  Report an Issue  |  Terms of Service